CSE: XXX
OTC: XXX
FSE: XXX
[1] 43-101 Technical Report on the Tyee Project – 2024
[2] power-eng.com/renewables/hydropower/
[3] iaac-aeic.gc.ca/050/evaluations/proj/80078
Mineralization hosted on adjacent or nearby properties is not necessarily indicative of mineralization on the Company’s property.
Source: 43-101 Technical Report on the Tyee Project – 2024
Mineralization hosted on adjacent or nearby properties is not necessarily indicative of mineralization on the Company’s property.
The Project is situated within the Havre-St-Pierre Anorthosite Complex, a Proterozoic intrusive suite known to host massive ilmenite-magnetite mineralization with associated vanadium and scandium enrichment. Mineralization styles at Tyee are consistent with known anorthosite-hosted titanium systems and are consistent with geological characteristics of anorthosite-hosted titanium systems.
Historical exploration across the Project included:
This legacy work materially de-risks the Project and shortens the timeline to drilling.
Rock grab samples are selective by nature and may not represent the true underlying mineralization of the property.
All samples were collected and analyzed using industry standard procedures. Analytical work was completed by an independent accredited laboratory.
Collectively, the Tyee Project hosts multiple high-quality, drill-ready titanium targets supported by extensive prior geophysics and surface validation.
1
BIG TiO
2
NS TREND
3
EAST NUGGET
The Project is drill-ready & benefits from substantial prior exploration, and is in a Tier-1 jurisdiction.
Our Phase One exploration plan includes:
Infrastructure & Operating Environment
The Project benefits from excellent regional infrastructure, including:
The region’s long history of large-scale mining reduces execution and permitting risk relative to greenfield districts.
FSE: S58